FMCG Lakeview Infrastryctures – Dholera
Status
Complete
Project Type
Industrial Piling
Total Length
1,080 running meters
Complated Date
10 Jun, 2026

Project description
DrillWell Solutions successfully completed the FMCG Lakeview Infrastructures Foundation Piling Project in Dholera, Ahmedabad, Gujarat. The project involved the execution of 510 foundation piles with a total piling work of 5,100 running meters.
Each pile was constructed with a 450 mm diameter and 10-meter depth, providing a strong and reliable foundation for the development. Our experienced piling team used professional equipment and established piling techniques to ensure accurate drilling, pile alignment, depth control, and quality execution.
The project demonstrates DrillWell Solutions capability to handle large-scale foundation piling works, delivering efficient and dependable deep foundation solutions for infrastructure and construction projects across Gujarat.
Key Details
- Project Name: FMCG Lakeview Infrastructures
- Location: Dholera, Ahmedabad, Gujarat
- Project Type: Infrastructures Foundation Piling
- Total Meter Work: 5,100 R.M.
- Number of Piles: 510
- Pile Diameter: 450 mm
- Pile Depth: 10 meters
Project Highlights
Advanced Rotary Piling Equipment
Modern TMR rotary rigs ensured accurate and efficient pile installation.
Experienced Engineering Team
Executed by skilled and trained piling operators.
High Structural Accuracy
Maintained pile verticality and design specifications throughout execution.
Quality Concrete Placement
Used high-quality concrete for strong and durable foundations.
Safety Compliance
Strict adherence to construction safety standards at every stage.
Timely Project Completion
Completed within the scheduled project timeline.
Soil-Based Design Execution
Pile depths were executed according to site soil conditions.
Industrial Foundation Expertise
Designed to support heavy industrial structures and equipment.
Project Location
address
FMCG Lakeview Infrastructures, Dholera, Ahmedabad, Gujarat, India
Key transport
Project Type:
Foundation Piling Work
Client:
FMCG Lakeview Infrastructures
Total Meter Work:
5,100 R.M.
Pile Diameter:
450mm
Number of Piles:
510
Pile Depth:
10 meters